References
| Companies | year of completion |
| A&P Technologies, s.r.o., Czech Republic | |
|---|---|
| Production of gas control line of vacuum station LF1 |
|
| Production of gas control line of natural gas and oxygen | 2006 |
| Production of gas control line of oxygen for production plant Podbrezová | 2006 |
| Production of control lines Ferriere | 2006 |
| Ampluservis, a.s., Czech Republic | |
| RGO K13 Control boxes PV - ETB | 2008 |
| ArcelorMittal, a.s. - Frýdek Místek, Czech Republic | |
| Repair of feed pump No.6 | 2009 |
| Overhaul and repair of steam turbine, type MV 400 | 2009 |
| Overhaul and repair of back-pressure turbine 4MW, type R4-34-435/02, serial No. 3803 | 2009 |
| Repair of feed pump No.6, type C-HVA-80/XI/2E | 2008 |
| Overhaul and repair of steam turbine, type MV 400 | 2008 |
| Overhaul and repair of back-pressure turbine 4MW, type R4-3,5/02, serial No.3803 | 2007 |
| General overhaul of pressure unit of boiler K3 | 2006 |
| ArcelorMittal Tubular Products Karviná a.s., Czech Republic | |
| Repair of water pump station and valves | 2009 |
| Bytový podnik Český Těšín, Czech Republic | |
| Boiler-rooms service | |
| C.Q.M (Cooling Quality Management) Ltd., Israel | |
| Assembly of continual cleaning of the condenser No.32 of company Atel Energetika Zlín | 2008 |
| ČEZ, a.s., Czech Republic | |
| Production of stop valves for the Tisová Power Plant | 2006 |
| ČKD NOVÉ ENERGO, a.s., Czech Republic | |
| General overhaul of turbo-blower TD13 | 2005 |
| Disassembly and assembly of turbo-exhauster -Koksovna TŽ | 2008 |
| DALKIA ČR, a.s., Czech Republic | |
| Repair of gearbox of boiler grate K5 of Krnov heating plant | |
| Slovenská – pumps for summer operation | 2008 |
| Water circulating pump in Třebovice power plant | 2008 |
| RGO K1 Frýdek Místek heating plant | 2008 |
| Repair of 7 pcs of fan propeller | 2007 |
| Spa station reconstruction | 2007 |
| GO of tanks and heat exchanger in Třebovice power plant | 2006 |
| Design of condensate collection in Třebovice power plant | 2006 |
| Heat exchanger for feed water heating in Třebovice power plant | 2006 |
| Modification of boiler evaporator K5 in Třebovice power plant | 2006 |
| Heat utilization from continuously blowdown water of K12, K13, K14 of Třebovice power plant | 2006 |
| Routine repairs (RR) of boilers K4, K6, K8 in VMH | 2006 |
| Routine repairs of boilers K1–K4 of Přívoz heating plant | 2006 |
| Exchange of boiler evaporator K4 in Třebovice power plant | 2006 |
| Repair of outlet steam pipes of boilers starting in VMH | 2006 |
| Reconstruction of control of reduction and heat exchange station - Ostrava Fifejdy | 2005 |
| Reverse assembly of subcooler | 2005 |
| Reconstruction of RCHS of Krnov heating plant | 2004 |
| RGO HK101 of Třebovice power plant | 2004 |
| GO of boilers K4, K6 - Mariánské Hory heating plant | 2004 |
| Repair of delivery conduit of VTN 142 | 2004 |
| Reconstruction of RCHS 20 of Třebovice power plant | 2003 |
| Optimalization of temperature of boiler K5 waste gases | 2003 |
| Routine repairs of boilers K1–K4 of Přívoz heating plant | 2003 |
| RR of HK101 of Třebovice power plant | 2003 |
| General overhaul of travelling grate stoker K5 of Krnov heating plant | 2003 |
| Optimalization of blower station of Krnov heating plant | 2003 |
| Exchange of radiant superheaters and steam chests of boilers K1 and K4 at TPV | 2002 |
| Repair of high-pressure feed pump of Třebovice power plant | |
| Medium repair of boilers K1, K3 of Karviná power plant | |
| Alkalization of boiler-water with phosphate of Třebovice power plant | |
| EKOL, s.r.o., Czech Republic | |
| Supervise assembly of piping TG 6MW, Qous, Egypt | 2009 |
| Repair of TD11, ET, a.s. | 2008 |
| Disassembling work on TG in ESMO Mohelnice | 2008 |
| Elaboration of realization documentation of project Kielce, Poland | 2007 |
| Design, production and assembly of oil system of TG 1MW, Chomutov | 2007 |
| Elaboration of realization documentation of project Suwalki, Poland | 2007 |
| Repair of turbines of Vřesová power plant TG3, TG4 (55MW), TG22 | 2007 |
| GO of TK1, ET, a.s. | 2007 |
| ADATO 2 - elaboration of realization documentation , supply and installation of steam turbine piping 5,4MW | 2006 |
| ADATO 2 - elaboration of implementation documentation of steam turbine piping 5,4MW | 2006 |
| ADATO 2 - supply and installation of steam turbine piping 5,4MW | 2006 |
| ADATO 2 - elaboration of implementation documentation of steam turbine piping 5,4MW | 2006 |
| ADATO1 - elaboration of implementation documentation of steam turbine piping 1,5MW | 2006 |
| Installation of steam turbine piping (6,5MW) Borken, Germany | 2006 |
| Repair of turbo-generator TG14 (ET, a.s.) including stator blades assembly | 2006 |
| Assembly of oil system of turbo-blower TD13, ET, a.s. | 2005 |
| ENERGETIKA TŘINEC, a.s., Czech Republic | |
| Medium repairs of boilers, turbo-compressors, turbo-generators | |
| Cooperation at construction of fluid boilers K 11, K12 (160 t/hour) | |
| Exchange of tubes – condenser of TK 2, TD 11, ŠOS, ŠOZ | |
| Construction of 2 pcs of air compressors | |
| E3 Machine-room aeration | |
| Modification of rinsing water circuit of electrofilter KOP, Borek | |
| Repair of piping DN 400 piping line Water-station 1 – CHÚV | |
| ENERGOAQUA, a.s. – Rožnov pod Radhoštěm, Czech Republic | |
| Repair of condenser III – exchange of rifled tubes | |
| Repair of condenser II – exchange of rifled tubes | 2005 |
| Repair of condenser I – exchange of rifled tubes | 2003 |
| G-TEAM, Czech Republic | |
| Reduction station Šverma | 2003 |
| Hořáky Třebíč, Czech Republic | |
| Production of 8 pcs of nozzles | 2006 |
| Ingersoll Rand, Czech Republic | |
| Production of oil tanks | 2002 |
| Engineering, supply, assembly and commissioning of machine-technology part of cooling circuit of compressors | 2002 |
| Design, supply and assembly of distribution production technology liquids | 2002 |
| Istroenergo Group, a.s., Slovakia | |
| Installation of connecting piping of the new boiler NK1, ET, a.s. | 2006 |
| Repair of delivery conduit DN800 of the cooling tower CHV2 from shutting flap to cooling tower | 2006 |
| Repair of cooling towers and fittings of E2, ET, a.s. | 2004 |
| K.M.P.control, spol. s r.o., Czech Republic | |
| Production of air cases | 2005 |
| Production of 2 pcs of clack valves | 2005 |
| Production and assembling of burners EVI | 2005 |
| KOFING, a.s., Czech Republic | |
| Production of pressure system for boxes of cinder spray, US Steel Košice | 2006 |
| Lázně Darkov, a.s., Czech Republic | |
| Service work | |
| LDM servis, spol. s r.o., Czech Republic | |
| Design, supply and installation of safety valves of reduction station RS1, ET, a.s. | 2004 |
| Liberecké kotlárny – Hölter, s.r.o., Czech Republic | |
| General overhaul of the boiler K2 of Počerady power plant, ČEZ, a.s. | 2002 |
| Repair of pulverized coal burners K 24 in Prunéřov power plant | 2004 |
| Repair of pulverized coal burners K 25 in Prunéřov power plant | 2005 |
| LINDE GAS, a.s., Czech Republic | |
| Repair of dividing apparatus No.2, Třinec | |
| Repair of dividing apparatus No.3, Třinec | |
| Repair of dividing apparatus No.4, Třinec | |
| Repair of turbo air compressor TKV1 | |
| Repair of turbo air compressor TKV2 | |
| Repair of oxygen turbo compressor TKK1 | |
| Repair of oxygen turbo compressor TKK2 | |
| Repair of oxygen turbo compressor TKK3 | |
| Repair of oxygen turbo compressor TKK4 | |
| Repair of adsorber of rich liquid No. 2 - Třinec | |
| Repair of turbo air compressors coolers | |
| LINDE Vítkovice, a.s., Czech Republic | |
| Medium repair of piston-type compressor KPK1 | 2008 |
| Medium repair of turbo air compressor VTK3 | 2008 |
| Exchange of tubes in 1 compressor cooler KTK1 and in 2 pcs of VTK1coolers | 2007 |
| Medium repair of turbo air compressor VTK2 | 2006 |
| Repair of expansion turbine –Vítkovice production centre | |
| Linde Technické Plyny Slovensko k.s., Czech Republic | |
| Service in Ružomberok production centre | |
| OKD, a.s., Czech Republic | |
| Repair of induced draught fans of boiler K1, K4 – Lazy Mine boiler room | |
| Plzeňský prazdroj, a.s., Czech Republic | |
| Repair of boiler leakage | |
| Polna corp, s.r.o., Czech Republic | |
| Production of injection chambers | |
| RWE Transgas, a.s., Czech Republic | |
| Service work at gas storages Třanovice | |
| Siemens Industry Turbomachinery, s.r.o., Czech Republic | |
| Construction of turbo generator TG 25 MW Zenica, Bosnia and Herzegovina | |
| SIGMA GROUP, a.s., Czech Republic | |
| Feed pump electric motor overhaul VTN 121 of company Dalkia Morava, a.s. | |
| SIGMIA TRADING INTERNATIONAL , spol. s r.o., Czech Republic | |
| GO of pump station of Water station No.1 (exchange of 4 pumps) | |
| GO of pump station DORRY ( exchange of 5 pumps ) | |
| Exchange of the pump No.8 of Water station No.1 | |
| Slovenské elektrárny, a.s., Slovakia | |
| Production of fluid boilers stop valves for Vojany power plant | 2006 |
| Production of fluid boilers stop valves for Vojany power plant | 2006 |
| Steam Power GmbH, Austria | |
| Turbine disassembly in Linz power plant, Austria | 2006 |
| Boiler disassembly in Linz power plant, Austria | 2006 |
| TG1Turbine disassembly, ET, a.s. | 2006 |
| ŠKODA POWER, a.s., Czech Republic | |
| Production of weldments - 2 pcs transverse and 2 pcs side walls, Majilones, Chile | 2008 |
| Production of siphon box | 2008 |
| Production of condenser extension Hoechst, Germany | 2008 |
| Assembly work in Amager, Denmark | 2008 |
| Condenser repair in Riga, Latvia | 2008 |
| Repair of quick stop valve chest, Dětmarovice | 2008 |
| Construction of high-pressure unit of turbo generator NTG2 | 2007 |
| Construction of turbo generator 86 MW Hoechst, Germany | 2007 |
| Production of spare parts | |
| VAMOZ servis, a.s., Czech Republic | |
| General overhaul of the boiler K6 – plant No.4 Energetics, Nová Huť, a.s. | |
| General overhaul of the boiler K8, plant No.4 Energetics , Nová Huť, a.s. | |
| General overhaul of the boiler K11, plant No.4 Energetics , Nová Huť, a.s. | |
| VESUVIUS ČESKÁ REPUBLIKA, a.s., Czech Republic | |
| Service work | 2009 |
| Vesuvius Solar Crucible, s.r.o., Czech Republic | |
| Service work | 2009 |
| WALMARK, a.s., Czech Republic | |
| Reconstruction of heat economy – construction of the new boiler-room, production plant | 2003 |
| WOLCON, South Africa | |
| Disassembly of TG 40 MW Chemko Strážské, Slovakia | 2008 |
exchange of membrane wall, repair of non pressure part of the boiler